IDS Crystal Court - Minneapolis, MN
More than thirty years of water leakage caused significant damage to the roofing between the skylights over the IDS Crystal Court. AMBE LTD devoted three years researching the best solutions and products, writing exact repair specifications and writing safety guidelines and procedures. Working under our supervision, Peterson Bros. Roofing was able to overcome inherent problems necessitated by working during daylight hours and completed the job on-time and on-budget. We are proud of the completed work, in terms of both waterproofing and job safety.
1.
Jobsite set-up and hoisting operations by Peterson
Bros. Roofing at the IDS Crystal court in Minneapolis, Minnesota.
2. Upon removal of the asphalt patch material, deteriorated roof decking was located. Water penetration had caused spalling of the lightweight concrete decking. All deteriorated decking was
removed down to the metal framing.
3. All areas were power washed in preparation for installation of the new membrane.
4. Overview and close-up of areas primed in
preparation for membrane application. Silica sand embedded into all areas of primer.
5. Overview of completed corner detail.
6. Flashing application at risewall sections.
7. Completed risewall flashing detail.
8. Deck repairs were completed with a slurry of epoxy primer and silica sand.
9. Overview of the completed flashing detail at the structural steel beams.
10. Skylight domes and windows were covered with
kraft paper and masking tape during the membrane installation.
11. Overview and close-up of completed scupper detail.
12. Installation of deck repair material.
13. Completion of roof deck repair.
14. Completion corner detail.
15. Overview of the completed retail roof section.
16. Overview of the IDS Crystal Court during the ongoing roof restoration by Peterson Bros. Roofing.
17. Overview of ongoing roofing operations on the IDS Crystal Court from the tower roof.
|
|
 |